September 29 (Day 82) Ewww!

Our first of three late nights last night. We stayed at the office
until ARCENT (HHQ for money, near Atlanta) released us. We did that in
case they needed us to do anything over here to assist with their fiscal
year close-out actions in the states. Wasn't too bad last night, we
were released at 2300 hrs. Made for an early morning today getting in
my run, but it was tolerable. Everyone was in a jovial mood last night,
so it helped the time go by.



Heard the familiar and recognizable buzz of an MQ-1 Predator Unmanned
Aerial System flying around the other day. Couldn't see it from the
ground, but the noise is very distinctive. I guess you could say it's
the new sound of freedom since Predators and Reapers are doing most of
the air-to-ground attacks these days instead of fighters. Nice to hear
since I worked on those programs at the Pentagon.



Time for another scatological discussion. A faithful reader asked about
the plumbing situation in our new building. Alas, it's not as nice as
the palace. In the palace, the water pressure was sufficient to
overcome inferior standards so you could take care of all your business.
Sewer pipes in this country are only two inches in diameter. Locals use
bidets and they don't flush their paper. Only what comes out of your
body goes down the drain. Local plumbing just can't stand up to
American bathroom habits and paper-flushing (think what happens when
your kid flushes toy Spidey down the drain ...). In our new building,
we have the same two-inch pipes, but not nearly the water pressure of
the palace. Thus, we can only conduct half of our business inside our
building. The rest of the business must be conducted in a toilet
trailer near your CHU or outside our building in one of our four lovely
porta-pots. So much for taking care of business on the man's dime; I'll
be taking care of mine before I come to work.